Building Kits
A work order for kits must be created prior to picking. Review the “Kit Request” work instruction.
...
On the mobile scanner, select the “Cluster Pick” work flow.
The operator scans the work zone.
Work zone: DEFAULT
Note JASCI is case sensitive!
The operator proceeds to scan the kit cart.
OPEN sales orders are allocated to the pick tote at this point.
The kit cart ID is not the LPN.
Step 3: Verify Location
The operator is directed to a location.
The operator will verify the location by scanning the location bar code.
Step 4: Pick Product
...
The operator scans the slot LPN and transfers the picked product into the directed slot.
The slot LPN is not the kit cart ID.
Repeat: 3 - 5
Repeat steps 3 - 5 for all child products.
Once all child products are collected, the operator will need to physically and systematically build a kit.
...
Once all kits are built, they will need to be putaway.
Review the “Putaway” work instruction.