Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Building Kits

A work order for kits must be created prior to picking. Review the “Kit Request” work instruction.

...

  • On the mobile scanner, select the “Cluster Pick” work flow.

  • The operator scans the work zone.

    • Work zone: DEFAULT

    • Note JASCI is case sensitive!

  • The operator proceeds to scan the kit cart.

    • OPEN sales orders are allocated to the pick tote at this point.

    • The kit cart ID is not the LPN.

Image RemovedImage Added

Step 3: Verify Location

  • The operator is directed to a location.

    • The operator will verify the location by scanning the location bar code.

Image RemovedImage Added

Step 4: Pick Product

...

  • The operator scans the slot LPN and transfers the picked product into the directed slot.

    • The slot LPN is not the kit cart ID.

Image RemovedImage Added

Repeat: 3 - 5

  • Repeat steps 3 - 5 for all child products.

  • Once all child products are collected, the operator will need to physically and systematically build a kit.

...

  • Once all kits are built, they will need to be putaway.

    • Review the “Putaway” work instruction.